If a full bathroom remodel isn't in the plan this year, a vanity replacement is the upgrade that changes the room the most for the money. The vanity is the first thing you see when you walk in, and swapping a dated builder-grade cabinet for a well-built piece with a stone top can make a 20-year-old bathroom feel current. A painted cabinet with a stone top and matched mirrors, like the vanity above, is the look most of our clients choose when they update a primary bath.

2026 VANITY REPLACEMENT COSTS

ScopeTypical DMV Range (Installed)
Single vanity, 24–36", stock with top$1,200 – $2,500
Single vanity, semi-custom with stone top$2,200 – $4,000
Double vanity, 60–72", stock with top$2,800 – $5,500
Custom double vanity with fabricated quartz$5,500 – $10,000+

Those ranges cover removal and disposal of the old unit, setting and leveling the new cabinet, top and sink installation, new faucet(s), supply lines and drain connections, and caulking. The cabinet itself is usually 40–60% of the total.

THE ADD-ONS THAT MOVE THE NUMBER

STOCK, SEMI-CUSTOM, OR CUSTOM?

Stock vanities from big-box stores come in standard widths with a top included — fast and affordable, but construction varies widely. Look for plywood boxes over particleboard and soft-close hardware. Semi-custom lets you choose finish, hardware and top separately and is where most of our clients land. Custom makes sense for odd widths, built-in towers, or when the vanity needs to match other millwork in the home.

SIZING TIPS

If you're replacing the vanity and know you'll redo the floor within a few years, do the floor first or at the same time. Setting a new vanity on old flooring and then tiling around it later almost always costs more than doing both together.

HOW LONG IT TAKES

With materials on site, a straight swap is a one-day job; a double vanity with plumbing changes and a fabricated top is usually 2–4 days, with the stone top templated after the cabinet is set and installed about a week later. If you're weighing a bigger project, our bathroom remodel cost guide covers the full picture.

RELATED READING

Planning a project? See our Bathroom Remodeling service page for scope, process and recent work.